IS WORK OVER?

Automation index

How much of a Plastic surgeon’s job can AI already do?

A morph and a consent form come earlier. Cutting, stitching and not getting necrosis do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Plastic surgeon

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, photos and informed consent.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Operate: flaps, implants and burns.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Pre-op, markings and what you can actually promise.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Post-op, dressings and reviewing the result.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Emergencies: hand, face and the lip that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Aesthetics, reconstruction and signing what is cut.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plastic surgery
  • flaps
  • implants
  • burns
  • hand surgery
  • pre-op marking
  • post-op dressings
  • reconstruction

Sources for this job· O*NET 29-1242.00· ESCO/ISCO 2212

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 449Orthopaedic surgeon21%
  2. 450Urologist21%
  3. 451Teaching assistant20%
  4. 453Tow-truck driver20%
  5. 454Private-hire driver20%
  6. 455Dietitian20%