Automation index
Can AI do the work of a Plumber?
Today an AI or a robot can hardly do this job for you. The site, the surprises, and the code are settled on the ground.
It does not tell you how many jobs will vanish.
Task comparison
IS WORK OVER?
Plumber
28%↑
AI or a robot can already do 28% of this job.
#60 / 103
View rankingPlumber
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Cut, thread, or hammer pipes to specifications, using tools such as saws, cutting torches, pipe threaders, or pipe benders.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Locate and mark the position of pipe installations, connections, passage holes, or fixtures in structures, using measuring instruments such as rulers or levels.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Direct helpers engaged in pipe cutting, preassembly, or installation of plumbing systems or components.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Select pipe sizes, types, or related materials, such as supports, hangers, or hydraulic cylinders, according to specifications.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Lay out full scale drawings of pipe systems, supports, or related equipment, according to blueprints.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Assemble pipe sections, tubing, or fittings, using couplings, clamps, screws, bolts, cement, plastic solvent, caulking, or soldering, brazing, or welding equipment.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 28% | +1.4 |
Attach pipes to walls, structures, or fixtures, such as radiators or tanks, using brackets, clamps, tools, or welding equipment.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 28% | +1.4 |
Install pipe assemblies, fittings, valves, appliances such as dishwashers or water heaters, or fixtures such as sinks or toilets, using hand or power tools.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 28% | +1.4 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 53% | 28% | +14.8 |
| Total | 100% | 28% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- pipes
- blockages
- solder copper
- sanitary ware
- plumbing tools
- types of piping
- replace faucets
- work ergonomically
- prepare copper pipes for use as gas lines
- snap chalk line
Sources for this job· O*NET 47-2152.00· ESCO/ISCO 7126
IS WORK OVER?
Construction laborer
29%
#45 / 103
View rankingConstruction laborer
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.EstimateNo public source pins this saving. It is an estimate of the method. | 12% | 28% | +3.4 |
Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.EstimateNo public source pins this saving. It is an estimate of the method. | 9% | 28% | +2.5 |
Lubricate, clean, or repair machinery, equipment, or tools.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 12% | +1 |
Measure, mark, or record openings or distances to layout areas where construction work will be performed.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 55% | +4.4 |
Read plans, instructions, or specifications to determine work activities.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 26% | 28% | +7.3 |
| Total | 100% | 29% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- install wood elements in structures
- apply finish to concrete
- inspect masonry work
- check compatibility of materials
- dig soil mechanically
- pour concrete
- transport construction supplies
- operate digging construction equipment
- work in a construction team
- inspect construction supplies
Sources for this job· O*NET 47-2061.00· ESCO/ISCO 9313