IS WORK OVER?

Automation index

How much of a Podiatrist’s job can AI already do?

A file and a gait study come earlier. Cutting, operating in clinic, and not infecting do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Podiatrist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Files, gait studies and prescriptions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Design insoles and orthotic orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Chiropody, minor surgery and dressing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Examine, diagnose and explain.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Diabetic follow-up and wounds.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Clinic hygiene and care.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Files, gait studies and prescriptions
  • Design insoles and orthotic orders
  • Chiropody, minor surgery and dressing
  • Examine, diagnose and explain
  • Diabetic follow-up and wounds
  • Clinic hygiene and care
  • podologo
  • podiatrist

Sources for this job· O*NET 29-1081.00· ESCO/ISCO 2269

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Analyse my job

Jobs with similar scores

  1. 694Excavator operator18%
  2. 695Shepherd18%
  3. 696Vehicle painter18%
  4. 698Civil protection volunteer18%
  5. 699Upholsterer18%
  6. 700Taxi driver18%