IS WORK OVER?

Automation index

How much of a Podiatrist’s job can AI already do?

A file and a gait study come earlier. Cutting, operating in clinic, and not infecting do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Podiatrist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Files, gait studies and prescriptions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Design insoles and orthotic orders.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Chiropody, minor surgery and dressing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Examine, diagnose and explain.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Diabetic follow-up and wounds.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Clinic hygiene and care.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Files, gait studies and prescriptions
  • Design insoles and orthotic orders
  • Chiropody, minor surgery and dressing
  • Examine, diagnose and explain
  • Diabetic follow-up and wounds
  • Clinic hygiene and care
  • podologo
  • podiatrist

Sources for this job· O*NET 29-1081.00· ESCO/ISCO 2269

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 584Excavator operator18%
  2. 585Shepherd18%
  3. 586Vehicle painter18%
  4. 588Civil protection volunteer18%
  5. 589Upholsterer18%
  6. 590Taxi driver18%