IS WORK OVER?

Automation index

How much of a Port crane operator’s job can AI already do?

A stowage plan comes earlier. Lifting the box without hitting the ship do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Port crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stowage, bays and the twistlock.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, the wind and the spreader.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shift, the ship that arrives and the one that leaves.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Breakdown, the spreader that will not lock and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The docker below and covering nobody.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Not hitting the ship, and leaving the bay clear.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stowage
  • twistlocks
  • spreader
  • bays
  • lift boxes
  • quay wind
  • terminal shifts
  • cover nobody

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 579Train driver18%
  2. 580Shellfish gatherer18%
  3. 581Stonemason18%
  4. 583Tower crane operator18%
  5. 584Excavator operator18%
  6. 585Shepherd18%