Automation index
How much of a Port crane operator’s job can AI already do?
A stowage plan comes earlier. Lifting the box without hitting the ship do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Port crane operator
18%
AI can already do 18% of this job.
#582 / 643
View rankingPort crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Stowage, bays and the twistlock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, the wind and the spreader.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shift, the ship that arrives and the one that leaves.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Breakdown, the spreader that will not lock and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The docker below and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not hitting the ship, and leaving the bay clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stowage
- twistlocks
- spreader
- bays
- lift boxes
- quay wind
- terminal shifts
- cover nobody
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343
IS WORK OVER?
Dressmaker
19%
#520 / 643
View rankingDressmaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Block, cloth and the drape.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cut, make and the zip that puckers.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fitting, darts and the one that will not fit on Sunday.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Hem, lining and the shine of the cloth.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wedding, the surprise and not taking too much off.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That you can dance, and not splitting the seam.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- blocks
- drape
- darts
- zips
- hem
- dress fittings
- line
- party cloth
Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531