IS WORK OVER?

Automation index

How much of a Port crane operator’s job can AI already do?

A stowage plan comes earlier. Lifting the box without hitting the ship do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Port crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stowage, bays and the twistlock.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, the wind and the spreader.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shift, the ship that arrives and the one that leaves.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Breakdown, the spreader that will not lock and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The docker below and covering nobody.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Not hitting the ship, and leaving the bay clear.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stowage
  • twistlocks
  • spreader
  • bays
  • lift boxes
  • quay wind
  • terminal shifts
  • cover nobody

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 679Train driver18%
  2. 680Shellfish gatherer18%
  3. 681Stonemason18%
  4. 683Tower crane operator18%
  5. 684Excavator operator18%
  6. 685Shepherd18%