IS WORK OVER?

Automation index

How much of a Port crane operator’s job can AI already do?

A stowage plan comes earlier. Lifting the box without hitting the ship do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Port crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stowage, bays and the twistlock.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, the wind and the spreader.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shift, the ship that arrives and the one that leaves.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Breakdown, the spreader that will not lock and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The docker below and covering nobody.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Not hitting the ship, and leaving the bay clear.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stowage
  • twistlocks
  • spreader
  • bays
  • lift boxes
  • quay wind
  • terminal shifts
  • cover nobody

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 579Train driver18%
  2. 580Shellfish gatherer18%
  3. 581Stonemason18%
  4. 583Tower crane operator18%
  5. 584Excavator operator18%
  6. 585Shepherd18%