Automation index
How much of a Port crane operator’s job can AI already do?
A stowage plan comes earlier. Lifting the box without hitting the ship do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Port crane operator
18%
AI can already do 18% of this job.
#652 / 713
View rankingPort crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Stowage, bays and the twistlock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, the wind and the spreader.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shift, the ship that arrives and the one that leaves.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Breakdown, the spreader that will not lock and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The docker below and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not hitting the ship, and leaving the bay clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stowage
- twistlocks
- spreader
- bays
- lift boxes
- quay wind
- terminal shifts
- cover nobody
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343
IS WORK OVER?
Instructional designer
27%
#158 / 713
View rankingInstructional designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Aim, the storyboard and the module.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Pilot, the learner and what is not understood.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Activity, the feedback and not putting a silly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
LMS, the figure and not inflating completion.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the deadline and not cutting the practice.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That they learn, and not leaving the empty video.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- course storyboard
- modules
- learner pilot
- activities
- LMS
- completion
- feedback
- not a silly test
Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351