IS WORK OVER?

Automation index

How much of a Port crane operator’s job can AI already do?

A stowage plan comes earlier. Lifting the box without hitting the ship do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Port crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stowage, bays and the twistlock.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, the wind and the spreader.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shift, the ship that arrives and the one that leaves.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Breakdown, the spreader that will not lock and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The docker below and covering nobody.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Not hitting the ship, and leaving the bay clear.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stowage
  • twistlocks
  • spreader
  • bays
  • lift boxes
  • quay wind
  • terminal shifts
  • cover nobody

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Analyse my job

Jobs with similar scores

  1. 579Train driver18%
  2. 580Shellfish gatherer18%
  3. 581Stonemason18%
  4. 583Tower crane operator18%
  5. 584Excavator operator18%
  6. 585Shepherd18%