IS WORK OVER?

Automation index

How much of a Port crane operator’s job can AI already do?

A stowage plan comes earlier. Lifting the box without hitting the ship do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Port crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stowage, bays and the twistlock.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, the wind and the spreader.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Shift, the ship that arrives and the one that leaves.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Breakdown, the spreader that will not lock and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The docker below and covering nobody.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Not hitting the ship, and leaving the bay clear.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stowage
  • twistlocks
  • spreader
  • bays
  • lift boxes
  • quay wind
  • terminal shifts
  • cover nobody

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 689Train driver18%
  2. 690Shellfish gatherer18%
  3. 691Stonemason18%
  4. 693Tower crane operator18%
  5. 694Excavator operator18%
  6. 695Shepherd18%