IS WORK OVER?

Automation index

How much of a Potter’s job can AI already do?

A wheel comes earlier. Centring, pulling and surviving the kiln do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Potter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Clay, wheel and centring.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pull, turn and the one that collapses.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Dry, glaze and the kiln.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Order, the set and the colour that misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The market, the piece and not opening too wide.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Survive the kiln, and not leaving a fat foot.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • wheel
  • centre clay
  • pull pieces
  • glaze
  • kiln
  • drying
  • tableware sets
  • the foot

Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7314

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 472Family support worker20%
  2. 473Acupuncturist19%
  3. 474Piano tuner19%
  4. 476Wall tiler19%
  5. 477Arborist19%
  6. 478Grill cook19%