IS WORK OVER?

Automation index

How much of a Potter’s job can AI already do?

A wheel comes earlier. Centring, pulling and surviving the kiln do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Potter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Clay, wheel and centring.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pull, turn and the one that collapses.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Dry, glaze and the kiln.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Order, the set and the colour that misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The market, the piece and not opening too wide.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Survive the kiln, and not leaving a fat foot.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • wheel
  • centre clay
  • pull pieces
  • glaze
  • kiln
  • drying
  • tableware sets
  • the foot

Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7314

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Analyse my job

Jobs with similar scores

  1. 472Family support worker20%
  2. 473Acupuncturist19%
  3. 474Piano tuner19%
  4. 476Wall tiler19%
  5. 477Arborist19%
  6. 478Grill cook19%