Automation index
How much of a Poultry farmer’s job can AI already do?
A shed protocol comes earlier. The shed not collapsing and the flock coming out whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Poultry farmer
22%
AI can already do 22% of this job.
#323 / 633
View rankingPoultry farmer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Climate, ration and the mortality log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Shed, vaccines and the flock that turns.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Collection, eggs or birds and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Biosecurity, the visitor and the lorry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The price, the integrator and not dressing deaths.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The whole flock, and not pushing density.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- poultry sheds
- mortality
- vaccinate flocks
- biosecurity
- the integrator
- egg collection
- shed climate
- density
Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6122
IS WORK OVER?
Airport ramp agent
21%
#404 / 633
View rankingAirport ramp agent
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Load plan, LIR and hold allocation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Load, unload, pushback and ramp assistance.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Bags, ULDs and special cargo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate with crew, ops and fuel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Times, delays and ramp safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Trim, papers and liability for the load.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load aircraft
- do pushback
- allocate holds
- move bags
- load planning
- ramp assistance
- handle ULDs
- ramp safety
Sources for this job· O*NET 53-6051.00· ESCO/ISCO 9333