IS WORK OVER?

Automation index

How much of a Poultry farmer’s job can AI already do?

A shed protocol comes earlier. The shed not collapsing and the flock coming out whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Poultry farmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Climate, ration and the mortality log.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Shed, vaccines and the flock that turns.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Collection, eggs or birds and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Biosecurity, the visitor and the lorry.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The price, the integrator and not dressing deaths.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The whole flock, and not pushing density.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • poultry sheds
  • mortality
  • vaccinate flocks
  • biosecurity
  • the integrator
  • egg collection
  • shed climate
  • density

Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6122

Bridge engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, loads and the span.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the prestress and the one who did not tension.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Inspection, the crack and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving the village hanging.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it takes the lorry, and not signing the crack.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • spans
  • prestress
  • cracks
  • bridge inspection
  • loads
  • traffic closures
  • structural models
  • tensioning

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 356Building surveyor22%
  2. 357Foley artist22%
  3. 358Language assistant22%
  4. 360School librarian22%
  5. 361Botanist22%
  6. 362Chocolatier22%