IS WORK OVER?

Automation index

How much of a Poultry farmer’s job can AI already do?

A shed protocol comes earlier. The shed not collapsing and the flock coming out whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Poultry farmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Climate, ration and the mortality log.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Shed, vaccines and the flock that turns.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Collection, eggs or birds and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Biosecurity, the visitor and the lorry.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The price, the integrator and not dressing deaths.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The whole flock, and not pushing density.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • poultry sheds
  • mortality
  • vaccinate flocks
  • biosecurity
  • the integrator
  • egg collection
  • shed climate
  • density

Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6122

Chimney sweep

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inspection, camera and the flue report.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, sweep and the nest that blocks.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Tightness, draught and the one that will not draw.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Certificate, rules and the residents.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wet roof and not falling.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean for real, and not leaving loose soot.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sweep chimneys
  • flue camera
  • draught
  • flue certificate
  • nests
  • roofs
  • tightness
  • soot

Sources for this job· O*NET 47-4071.00· ESCO/ISCO 7133

Analyse my job

Jobs with similar scores

  1. 320Archaeologist22%
  2. 321Building surveyor22%
  3. 322Foley artist22%
  4. 324Botanist22%
  5. 325Chocolatier22%
  6. 326Forensic scientist22%