Automation index
How much of a Poultry farmer’s job can AI already do?
A shed protocol comes earlier. The shed not collapsing and the flock coming out whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Poultry farmer
22%
AI can already do 22% of this job.
#323 / 633
View rankingPoultry farmer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Climate, ration and the mortality log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Shed, vaccines and the flock that turns.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Collection, eggs or birds and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Biosecurity, the visitor and the lorry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The price, the integrator and not dressing deaths.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The whole flock, and not pushing density.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- poultry sheds
- mortality
- vaccinate flocks
- biosecurity
- the integrator
- egg collection
- shed climate
- density
Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6122
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142