IS WORK OVER?

Automation index

How much of a Poultry farmer’s job can AI already do?

A shed protocol comes earlier. The shed not collapsing and the flock coming out whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Poultry farmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Climate, ration and the mortality log.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Shed, vaccines and the flock that turns.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Collection, eggs or birds and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Biosecurity, the visitor and the lorry.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The price, the integrator and not dressing deaths.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The whole flock, and not pushing density.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • poultry sheds
  • mortality
  • vaccinate flocks
  • biosecurity
  • the integrator
  • egg collection
  • shed climate
  • density

Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6122

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 320Archaeologist22%
  2. 321Building surveyor22%
  3. 322Foley artist22%
  4. 324Botanist22%
  5. 325Chocolatier22%
  6. 326Forensic scientist22%