Automation index
How much of a Poultry farmer’s job can AI already do?
A shed protocol comes earlier. The shed not collapsing and the flock coming out whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Poultry farmer
22%
AI can already do 22% of this job.
#323 / 633
View rankingPoultry farmer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Climate, ration and the mortality log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Shed, vaccines and the flock that turns.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Collection, eggs or birds and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Biosecurity, the visitor and the lorry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The price, the integrator and not dressing deaths.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The whole flock, and not pushing density.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- poultry sheds
- mortality
- vaccinate flocks
- biosecurity
- the integrator
- egg collection
- shed climate
- density
Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6122
IS WORK OVER?
Concrete finisher
19%
#520 / 633
View rankingConcrete finisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, joints and thickness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pour, vibrate and float.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Screed, power float and the right moment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cure, polythene and the windy day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late mixer and the one who wants water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack open, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pour concrete
- vibrate
- float
- shrinkage joints
- power float
- cure
- screed
- slab thickness
Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114