Automation index
How much of a Poultry farmer’s job can AI already do?
A shed protocol comes earlier. The shed not collapsing and the flock coming out whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Poultry farmer
22%
AI can already do 22% of this job.
#323 / 623
View rankingPoultry farmer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Climate, ration and the mortality log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Shed, vaccines and the flock that turns.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Collection, eggs or birds and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Biosecurity, the visitor and the lorry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The price, the integrator and not dressing deaths.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The whole flock, and not pushing density.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- poultry sheds
- mortality
- vaccinate flocks
- biosecurity
- the integrator
- egg collection
- shed climate
- density
Sources for this job· O*NET 45-2021.00· ESCO/ISCO 6122
IS WORK OVER?
Electronics engineer
25%
#237 / 623
View rankingElectronics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schematic, simulation and PCB layout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Firmware, tests and bench.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Vendors, prototypes and certifications.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Debug EMC and field faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versioning and quality.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not sending a blind board to manufacture.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schematic, simulation and PCB layout
- Firmware, tests and bench
- Vendors, prototypes and certifications
- Debug EMC and field faults
- Documentation, versioning and quality
- Not sending a blind board to manufacture
- ingeniero electronico
- electronics engineer
Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152