IS WORK OVER?

Automation index

How much of a Power engineer’s job can AI already do?

A short-circuit study comes earlier. The disconnector not blowing without working live do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

CAD designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimensions and the drawing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Clash, the hit and not leaving it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
List, the material and the one that does not exist.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the revision and not losing the native.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shop, the doubt and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be made, and not leaving the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • 3D models
  • dimensions
  • clashes
  • bills of materials
  • revisions
  • shop drawings
  • natives
  • hits

Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 398District heating engineer22%
  2. 399Safety engineer22%
  3. 400Welding engineer22%
  4. 402Geomatics engineer22%
  5. 403Railway engineer22%
  6. 404Forestry engineer22%