Automation index
How much of a Power engineer’s job can AI already do?
A short-circuit study comes earlier. The disconnector not blowing without working live do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Power engineer
22%
AI can already do 22% of this job.
#401 / 753
View rankingPower engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Study, the short-circuit and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Substation, the disconnector and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Switching, the five rules and not skipping them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fault, the relay and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not blow, and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- short-circuits
- selectivity
- disconnectors
- five rules
- relays
- substations
- lockouts
- not work live
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151
IS WORK OVER?
Gas network engineer
22%
#397 / 753
View rankingGas network engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, pressures and the diameter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Trench, the weld and the one that was not x-rayed.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Leak, the detector and getting people out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cut, the bypass and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the rush and not covering without testing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the trench does not go up, and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- network pressures
- diameters
- trenches
- gas welds
- leaks
- detectors
- bypass
- x-rays
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145