Automation index
How much of a Power engineer’s job can AI already do?
A short-circuit study comes earlier. The disconnector not blowing without working live do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Power engineer
22%
AI can already do 22% of this job.
#401 / 753
View rankingPower engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Study, the short-circuit and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Substation, the disconnector and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Switching, the five rules and not skipping them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fault, the relay and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not blow, and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- short-circuits
- selectivity
- disconnectors
- five rules
- relays
- substations
- lockouts
- not work live
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165