Automation index
How much of a Power engineer’s job can AI already do?
A short-circuit study comes earlier. The disconnector not blowing without working live do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Power engineer
22%
AI can already do 22% of this job.
#411 / 763
View rankingPower engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Study, the short-circuit and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Substation, the disconnector and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Switching, the five rules and not skipping them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fault, the relay and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not blow, and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- short-circuits
- selectivity
- disconnectors
- five rules
- relays
- substations
- lockouts
- not work live
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151
IS WORK OVER?
Tunnel engineer
22%
#410 / 763
View rankingTunnel engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Heading, the geology and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Water, the inflow and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Blast, the vibration and the building.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Segment, the ring and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not come down, and not hiding the water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tunnel headings
- support
- inflows
- blasts
- segments
- tunnel geology
- rings
- vibrations
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142