IS WORK OVER?

Automation index

How much of a Power-plant operator’s job can AI already do?

A dispatch comes earlier. Following the set-point without tripping the machine do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Power-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-point, parameters and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Room, alarms and the one that trips.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Start, stop and not skipping the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, isolation and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the grid and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The set-point, and not tripping.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • set-points
  • control room
  • plant SOP
  • starts
  • isolations
  • alarms
  • dispatch
  • the grid

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Milliner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Block, crown and the material.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Shape, stitch and the brim that will not sit.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fit, the hair and the one that will not take a pin.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Trim, feather and the balance.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wedding, the wind and not making a prop hat.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it sits, and does not fly.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hat blocks
  • crowns
  • brims
  • feathers
  • pins
  • fit hats
  • trim
  • balance

Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7531

Analyse my job

Jobs with similar scores

  1. 524Plasterboard fitter19%
  2. 525Mosaicist19%
  3. 526Neurosurgeon19%
  4. 528Demolition worker19%
  5. 529Wastewater-plant operator19%
  6. 530Concrete finisher19%