Automation index
How much of a Printing press operator’s job can AI already do?
A preflight and a colour profile come earlier. Calibrating the press and not wasting the run do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Printing press operator
27%
AI can already do 27% of this job.
#157 / 633
View rankingPrinting press operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Preflight, imposition and colour profiles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Calibrate, ink and start the press.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Watch register, density and defects on the run.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Job change, plates and wash-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Finishing, guillotine and delivery.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Stock, times and liability for the run.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run offset
- calibrate colour
- preflight files
- watch register
- ink the press
- avoid wasting the run
- imposition
- change plates
Sources for this job· O*NET 51-5112.00· ESCO/ISCO 7322
IS WORK OVER?
Alarm installer
23%
#300 / 633
View rankingAlarm installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagram, zones and programming the panel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Wire, sensors and the detector that trips alone.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
ARC, tests and the connection note.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Train the user and the fob that gets lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The lived-in flat, the brick and not breaking extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No false alarms, and a real call-out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit alarms
- program panels
- wire sensors
- ARC
- avoid false alarms
- train the user
- detectors
- alarm zones
Sources for this job· O*NET 49-2098.00· ESCO/ISCO 7412