IS WORK OVER?

Automation index

How much of a Printing press operator’s job can AI already do?

A preflight and a colour profile come earlier. Calibrating the press and not wasting the run do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Printing press operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Preflight, imposition and colour profiles.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Calibrate, ink and start the press.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Watch register, density and defects on the run.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Job change, plates and wash-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Finishing, guillotine and delivery.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Stock, times and liability for the run.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run offset
  • calibrate colour
  • preflight files
  • watch register
  • ink the press
  • avoid wasting the run
  • imposition
  • change plates

Sources for this job· O*NET 51-5112.00· ESCO/ISCO 7322

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 154Geneticist27%
  2. 155Collections officer27%
  3. 156Wealth manager27%
  4. 158Food engineer27%
  5. 159Automation engineer27%
  6. 160Energy engineer27%