Automation index
How much of a Printing press operator’s job can AI already do?
A preflight and a colour profile come earlier. Calibrating the press and not wasting the run do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Printing press operator
27%
AI can already do 27% of this job.
#157 / 623
View rankingPrinting press operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Preflight, imposition and colour profiles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Calibrate, ink and start the press.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Watch register, density and defects on the run.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Job change, plates and wash-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Finishing, guillotine and delivery.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Stock, times and liability for the run.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- run offset
- calibrate colour
- preflight files
- watch register
- ink the press
- avoid wasting the run
- imposition
- change plates
Sources for this job· O*NET 51-5112.00· ESCO/ISCO 7322
IS WORK OVER?
Ship captain
19%
#478 / 623
View rankingShip captain
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Passage plan, weather and clearance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bridge, manoeuvre and people aboard.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Crew, watches and fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Port, pilots and owner.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Safety, SOPEP and breakdowns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not losing a ship or a person.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Passage plan, weather and clearance
- Bridge, manoeuvre and people aboard
- Crew, watches and fatigue
- Port, pilots and owner
- Safety, SOPEP and breakdowns
- Not losing a ship or a person
- capitan de barco
- patron de altura
- ship captain
Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152