IS WORK OVER?

Automation index

How much of a Printing press operator’s job can AI already do?

A preflight and a colour profile come earlier. Calibrating the press and not wasting the run do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Printing press operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Preflight, imposition and colour profiles.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Calibrate, ink and start the press.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Watch register, density and defects on the run.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Job change, plates and wash-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Finishing, guillotine and delivery.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Stock, times and liability for the run.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run offset
  • calibrate colour
  • preflight files
  • watch register
  • ink the press
  • avoid wasting the run
  • imposition
  • change plates

Sources for this job· O*NET 51-5112.00· ESCO/ISCO 7322

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 166Collections officer27%
  2. 167Wealth manager27%
  3. 168Hepatologist27%
  4. 170Acoustics engineer27%
  5. 171Food engineer27%
  6. 172Automation engineer27%