IS WORK OVER?

Automation index

How much of a Printing press operator’s job can AI already do?

A preflight and a colour profile come earlier. Calibrating the press and not wasting the run do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Printing press operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Preflight, imposition and colour profiles.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Calibrate, ink and start the press.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Watch register, density and defects on the run.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Job change, plates and wash-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Finishing, guillotine and delivery.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Stock, times and liability for the run.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run offset
  • calibrate colour
  • preflight files
  • watch register
  • ink the press
  • avoid wasting the run
  • imposition
  • change plates

Sources for this job· O*NET 51-5112.00· ESCO/ISCO 7322

Tiler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Layout, levels and ordering tile.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, set and grout.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Substrates, falls and awkward points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and not staining the house.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and logs.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a floor that sounds hollow.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Layout, levels and ordering tile
  • Cut, set and grout
  • Substrates, falls and awkward points
  • Site, client and not staining the house
  • Quantities, extras and logs
  • Not leaving a floor that sounds hollow
  • solador

Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122

Analyse my job

Jobs with similar scores

  1. 154Geneticist27%
  2. 155Collections officer27%
  3. 156Wealth manager27%
  4. 158Food engineer27%
  5. 159Automation engineer27%
  6. 160Energy engineer27%