IS WORK OVER?

Automation index

How much of a Prison educator’s job can AI already do?

A wing pathway comes earlier. Being in the yard so the workshop does not go sideways do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Prison educator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Programmes, reports and the treatment board.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Wing, yard and the fight that blows up.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Workshop, studies and the one who shows up.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Family, leave and the note to the lawyer.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The hard inmate and not losing authority.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The bond inside, and it not being paper.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • treatment programmes
  • prison workshops
  • the yard
  • treatment board
  • leave reports
  • the wing
  • prison study
  • yard conflict

Sources for this job· O*NET 21-1092.00· ESCO/ISCO 2635

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 412Mixer-truck driver21%
  2. 413Animal breeder21%
  3. 414Youth educator21%
  4. 416Dialysis nurse21%
  5. 417Driving examiner21%
  6. 418Façade technician21%