Automation index
How much of a Prison educator’s job can AI already do?
A wing pathway comes earlier. Being in the yard so the workshop does not go sideways do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Prison educator
21%
AI can already do 21% of this job.
#415 / 633
View rankingPrison educator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Programmes, reports and the treatment board.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Wing, yard and the fight that blows up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Workshop, studies and the one who shows up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Family, leave and the note to the lawyer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The hard inmate and not losing authority.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The bond inside, and it not being paper.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- treatment programmes
- prison workshops
- the yard
- treatment board
- leave reports
- the wing
- prison study
- yard conflict
Sources for this job· O*NET 21-1092.00· ESCO/ISCO 2635
IS WORK OVER?
Robotics engineer
25%
#234 / 633
View rankingRobotics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paths, PLC and the cell twin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Cell, grippers and the cycle that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Safety, fencing and CE validation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Maintenance, backups and the overwritten program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Production, takt and the robot that stops.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it takes nobody with it, and signing the cell.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program robots
- paths
- robot cells
- safety fencing
- cell PLC
- CE validation
- grippers
- takt
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149