IS WORK OVER?

Automation index

How much of a Prison educator’s job can AI already do?

A wing pathway comes earlier. Being in the yard so the workshop does not go sideways do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Prison educator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Programmes, reports and the treatment board.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Wing, yard and the fight that blows up.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Workshop, studies and the one who shows up.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Family, leave and the note to the lawyer.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The hard inmate and not losing authority.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The bond inside, and it not being paper.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • treatment programmes
  • prison workshops
  • the yard
  • treatment board
  • leave reports
  • the wing
  • prison study
  • yard conflict

Sources for this job· O*NET 21-1092.00· ESCO/ISCO 2635

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 421Mixer-truck driver21%
  2. 422Animal breeder21%
  3. 423Youth educator21%
  4. 425Dialysis nurse21%
  5. 426Driving examiner21%
  6. 427Façade technician21%