Automation index
How much of a Probation officer’s job can AI already do?
A reporting calendar comes earlier. Stopping reoffending and calling it when it turns do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Probation officer
24%
AI can already do 24% of this job.
#295 / 733
View rankingProbation officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
The order plan, reporting and the conditions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visit, interview and what they do not say.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Reports to the judge and the breach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Network, work and the resource that is not there.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The victim, the offender and not mixing roles.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Call it in time, and not dressing the follow-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- probation
- order plan
- reports to the judge
- breach of conditions
- follow-up visits
- sentence conditions
- reoffending
- periodic reporting
Sources for this job· O*NET 21-1092.00· ESCO/ISCO 2635
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142