Automation index
How much of a Probation officer’s job can AI already do?
A reporting calendar comes earlier. Stopping reoffending and calling it when it turns do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Probation officer
24%
AI can already do 24% of this job.
#261 / 623
View rankingProbation officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
The order plan, reporting and the conditions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visit, interview and what they do not say.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Reports to the judge and the breach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Network, work and the resource that is not there.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The victim, the offender and not mixing roles.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Call it in time, and not dressing the follow-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- probation
- order plan
- reports to the judge
- breach of conditions
- follow-up visits
- sentence conditions
- reoffending
- periodic reporting
Sources for this job· O*NET 21-1092.00· ESCO/ISCO 2635
IS WORK OVER?
Mining engineer
22%
#341 / 623
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146