IS WORK OVER?

Automation index

How much of a Process engineer’s job can AI already do?

A diagram and a balance come earlier. Stopping the plant and not overloading the reactor do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Process engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
P&IDs, balances and the operating procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, trials and the real bottleneck.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Capacity, yields and the improvement report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Start-up, shutdown and the shift that skips the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Process safety and the HAZOP that hurts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not overloading the reactor, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • P&IDs
  • mass balances
  • HAZOP
  • plant start-up
  • improve yields
  • SOP
  • bottlenecks
  • process safety

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Arborist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Assess, risk and the owner’s report.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, prune and the anchor.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Controlled fell and the one over the cable.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Arisings, chipping and leaving it clean.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the permit and not entering their plot.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not dropping it on the roof, and coming down whole.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • crown work
  • climb
  • controlled fell
  • risk report
  • anchors
  • chipping
  • cables
  • felling permits

Sources for this job· O*NET 37-3013.00· ESCO/ISCO 6113

Analyse my job

Jobs with similar scores

  1. 202Cultural manager26%
  2. 203Screenwriter26%
  3. 204Structural engineer26%
  4. 206Midwife26%
  5. 207Penetration tester26%
  6. 208Court-appointed expert26%