Automation index
How much of a Process engineer’s job can AI already do?
A diagram and a balance come earlier. Stopping the plant and not overloading the reactor do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Process engineer
26%
AI can already do 26% of this job.
#205 / 633
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Drafter
26%
#197 / 633
View rankingDrafter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimension and issue sheets.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Quantities, legends and revisions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coordinate with architect, engineer and site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drawing standards, stamps and issue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Archive, BIM and clashes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not issuing a drawing nobody can read.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model, dimension and issue sheets
- Quantities, legends and revisions
- Drawing standards, stamps and issue
- Archive, BIM and clashes
- Not issuing a drawing nobody can read
- delineante
- proyectista
- drafter
- cad technician
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118