Automation index
How much of a Process engineer’s job can AI already do?
A diagram and a balance come earlier. Stopping the plant and not overloading the reactor do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Process engineer
26%
AI can already do 26% of this job.
#261 / 773
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Embedded developer
22%
#388 / 773
View rankingEmbedded developer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Firmware, the peripheral and the buffer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the hang and the log that is not there.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Watchdog, the reset and not leaving it blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Draw, the battery and not sleeping it wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Hardware, the revision and not fighting the pin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not hang, and not leaving the watchdog blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- firmware
- peripherals
- watchdog
- buffers
- draw
- battery
- field logs
- write embedded code
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514