Automation index
How much of a Process engineer’s job can AI already do?
A diagram and a balance come earlier. Stopping the plant and not overloading the reactor do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Process engineer
26%
AI can already do 26% of this job.
#205 / 633
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Mason
15%
#617 / 633
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112