IS WORK OVER?

Automation index

How much of a Process engineer’s job can AI already do?

A diagram and a balance come earlier. Stopping the plant and not overloading the reactor do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Process engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
P&IDs, balances and the operating procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, trials and the real bottleneck.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Capacity, yields and the improvement report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Start-up, shutdown and the shift that skips the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Process safety and the HAZOP that hurts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not overloading the reactor, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • P&IDs
  • mass balances
  • HAZOP
  • plant start-up
  • improve yields
  • SOP
  • bottlenecks
  • process safety

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 236Cultural manager26%
  2. 237Screenwriter26%
  3. 238Structural engineer26%
  4. 240Midwife26%
  5. 241Penetration tester26%
  6. 242Court-appointed expert26%