IS WORK OVER?

Automation index

How much of a Process engineer’s job can AI already do?

A diagram and a balance come earlier. Stopping the plant and not overloading the reactor do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Process engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
P&IDs, balances and the operating procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, trials and the real bottleneck.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Capacity, yields and the improvement report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Start-up, shutdown and the shift that skips the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Process safety and the HAZOP that hurts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not overloading the reactor, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • P&IDs
  • mass balances
  • HAZOP
  • plant start-up
  • improve yields
  • SOP
  • bottlenecks
  • process safety

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Wastewater-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, process and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Basin, the sludge and the one that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Breakdown, the pump and at night.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Test, the discharge and not hiding the spike.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the overflow and not opening extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come out clean, and the sludge in place.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • works flow
  • sludge
  • basins
  • pumps
  • discharges
  • overflows
  • plant logs
  • final tests

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Analyse my job

Jobs with similar scores

  1. 202Cultural manager26%
  2. 203Screenwriter26%
  3. 204Structural engineer26%
  4. 206Midwife26%
  5. 207Penetration tester26%
  6. 208Court-appointed expert26%