IS WORK OVER?

Automation index

How much of a Process engineer’s job can AI already do?

A diagram and a balance come earlier. Stopping the plant and not overloading the reactor do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Process engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
P&IDs, balances and the operating procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, trials and the real bottleneck.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Capacity, yields and the improvement report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Start-up, shutdown and the shift that skips the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Process safety and the HAZOP that hurts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not overloading the reactor, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • P&IDs
  • mass balances
  • HAZOP
  • plant start-up
  • improve yields
  • SOP
  • bottlenecks
  • process safety

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Well driller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Location, permit and the progress log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drill, case and the collapse.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Mud, samples and the geological log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Yield test, pump and the water analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The owner, the neighbour and the well that will not yield.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean water, and not leaving a blind well.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drill wells
  • case
  • yield test
  • drilling mud
  • geological log
  • samples
  • well pumps
  • drilling permits

Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113

Analyse my job

Jobs with similar scores

  1. 202Cultural manager26%
  2. 203Screenwriter26%
  3. 204Structural engineer26%
  4. 206Midwife26%
  5. 207Penetration tester26%
  6. 208Court-appointed expert26%