IS WORK OVER?

Automation index

How much of a Product owner’s job can AI already do?

A backlog and a user story write fast. Telling engineering no, and a customer yes, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Product owner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Write stories, criteria and backlog.
Estimate

No public source provides a precise figure. This is our estimate.

22%50%+11
Maps, roadmaps and release notes.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Refine with engineering and design.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Talk to users and stakeholders.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Prioritise, cut scope and say no.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Accept the increment and own the value.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Write stories, criteria and backlog
  • Maps, roadmaps and release notes
  • Refine with engineering and design
  • Talk to users and stakeholders
  • Prioritise, cut scope and say no
  • Accept the increment and own the value
  • product owner
  • po agil

Sources for this job· O*NET 15-1199.09· ESCO/ISCO 2519

Aerospace technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bench, the protocol and the torque.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Part, the lockwire and the one left loose.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
NDT, the crack and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Engine, the run and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The engineer, the rush and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Torque it, and not leaving the lockwire loose.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test bench
  • torque
  • lockwire
  • aerospace NDT
  • engine runs
  • protocols
  • cracks
  • not sign half done

Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115

Analyse my job

Jobs with similar scores

  1. 196Civil registry officer27%
  2. 197Talent scout27%
  3. 198University careers adviser27%
  4. 200Teacher27%
  5. 201Driving instructor27%
  6. 202Driving theory instructor27%