IS WORK OVER?

Automation index

How much of a Product owner’s job can AI already do?

A backlog and a user story write fast. Telling engineering no, and a customer yes, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Product owner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Write stories, criteria and backlog.
Estimate

No public source provides a precise figure. This is our estimate.

22%50%+11
Maps, roadmaps and release notes.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Refine with engineering and design.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Talk to users and stakeholders.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Prioritise, cut scope and say no.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Accept the increment and own the value.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Write stories, criteria and backlog
  • Maps, roadmaps and release notes
  • Refine with engineering and design
  • Talk to users and stakeholders
  • Prioritise, cut scope and say no
  • Accept the increment and own the value
  • product owner
  • po agil

Sources for this job· O*NET 15-1199.09· ESCO/ISCO 2519

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 168Nuclear medicine physician27%
  2. 169Office manager27%
  3. 170Talent scout27%
  4. 172Teacher27%
  5. 173Driving instructor27%
  6. 174Property developer27%