Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 623
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Air traffic controller
17%
#578 / 623
View rankingAir traffic controller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan sequences and read traffic forecasts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 32% | +5.8 |
Strips, tickets and inter-unit coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Tactical control of aircraft on frequency.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 6% | +1.3 |
Resolve conflicts, radio failures and weather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Train and supervise a controller under instruction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Reports, incidents and shift fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Plan sequences and read traffic forecasts
- Tactical control of aircraft on frequency
- Reports, incidents and shift fatigue
- controlador aereo
- air traffic
- atc
- torre de control
Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154