Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Book editor
25%
#220 / 633
View rankingBook editor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Readers’ reports, selection and rejection.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Work the text with the author: structure and tone.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
P&L, advances, contracts and the schedule.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coordinate copy-edit, layout, cover and press.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
List, bookshops and the life of the title.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The editorial bet and owning the book.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- edit books
- readers’ reports
- work manuscripts
- negotiate advances
- build the list
- coordinate layout
- choose the cover
- get it into shops
Sources for this job· O*NET 27-3041.00· ESCO/ISCO 2641