IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Calibration technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Standard, uncertainty and the certificate.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Instrument, the adjust and the one that will not go.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Field, the one that cannot move and the portable standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Lab, the temperature and not skipping the soak.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the rush and not signing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it measures, and a true certificate.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • standards
  • uncertainty
  • calibration certificates
  • adjust
  • instruments
  • thermal soak
  • metrology lab
  • the field

Sources for this job· O*NET 17-3028.00· ESCO/ISCO 3111

Analyse my job

Jobs with similar scores

  1. 235Biomedical engineer25%
  2. 236Civil engineer25%
  3. 237Petroleum engineer25%
  4. 239Robotics engineer25%
  5. 240Telecom engineer25%
  6. 241Electrical engineer25%