Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
Ceramicist
19%
#484 / 633
View rankingCeramicist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Body, mould and the curve.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Glaze, apply and the one that runs.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Kiln, atmosphere and the batch that sticks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Run, the order and the one that does not match.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The gallery, the deadline and not opening the kiln early.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not losing the batch, and signing the curve.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- firing curves
- bodies
- ceramic moulds
- glazes
- atmosphere
- runs
- runs of glaze
- the firing
Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7314