Automation index
How much of a Production engineer’s job can AI already do?
An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Production engineer
25%
AI can already do 25% of this job.
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141
IS WORK OVER?
CNC machinist
24%
#275 / 633
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223