IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Coast guard

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shout, the position and the boat.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Sea, the one who is drowning and the storm.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Inspection, the trawler and the one that runs.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Night, the radar and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The station, the note and not dressing the shortfall.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get the one who is drowning, and not losing the boat.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boats
  • shouts
  • drowning
  • trawlers
  • radar
  • the storm
  • inspections at sea
  • station notes

Sources for this job· O*NET 33-3051.00· ESCO/ISCO 5411

Analyse my job

Jobs with similar scores

  1. 261Biomedical engineer25%
  2. 262Civil engineer25%
  3. 263Petroleum engineer25%
  4. 265Robotics engineer25%
  5. 266Telecom engineer25%
  6. 267Electrical engineer25%