IS WORK OVER?

Automation index

How much of a Production engineer’s job can AI already do?

An OEE and a sequencer come earlier. Getting the shift out without stopping the line for nothing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Dosimetrist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CT, contours and the plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Organ at risk, the curve and not overshooting.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Physics, the check and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fraction, the setup and the patient who is not the same.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The oncologist, the trade-off and not signing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The tumour gets it, and the healthy organ does not.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dose plans
  • contours
  • organs at risk
  • dosimetry check
  • fractions
  • setup
  • sim CT
  • DVH curves

Sources for this job· O*NET 29-2036.00· ESCO/ISCO 3211

Analyse my job

Jobs with similar scores

  1. 235Biomedical engineer25%
  2. 236Civil engineer25%
  3. 237Petroleum engineer25%
  4. 239Robotics engineer25%
  5. 240Telecom engineer25%
  6. 241Electrical engineer25%